Nissan Maxima QX

since 1993 release

Repair and operation of the car



Nissan Maxima QX
+ Cars of the Nissan Maxima brand
+ Maintenance instruction
+ Settings and routine maintenance
+ Engine
- Cooling systems, heating
   General information
   Antifreeze - general information
   Check of serviceability of functioning and replacement of the thermostat
   Check of a condition of fans of the cooling system and chains of their inclusion, replacement of components
   Removal and installation of a radiator and expanded tank of the cooling system
   Check of a state and replacement of the water pump
   Check of serviceability of functioning and replacement of the block of the sensor of the measuring instrument of temperature of cooling liquid
   Check of serviceability of functioning of a driving electric motor of the fan of a heater and condition of components of its electric chain, …
   Removal and installation of an electric motor of the drive of the fan of a heater
   Removal and installation of assembly of the control panel of functioning of a heater and conditioner of air, adjustment of a driving cable
   Removal and installation of the heat exchanger of a heater
   Check of serviceability of functioning and service of systems of heating and air conditioning
   Removal and installation of a receiver dehumidifier To/in
   Removal, service and installation of the K/V compressor
   Removal and installation of the K/V condenser
+ Power supply system and release
+ Engine electric equipment
+ Control systems of the engine
+ Transmission
+ Coupling and power shafts
+ Brake system
+ Suspension bracket and steering
+ Body
+ Onboard electric equipment

Removal, service and installation of the K/V compressor

The air conditioning system constantly is under high pressure. Do not disconnect refrigerator lines at all and do not remove any components of system, previously without having executed a discharge of the last. The discharge of the air conditioning system has to be made by forces of the skilled expert in the conditions of a workshop of car service. At a rassoyedineniye of refrigerator lines surely put on goggles!

When replacing components of the air conditioning system the certain amount of replaceable refrigerator oil necessary for filling of volume of new knot will be required. Use only the oil good for the use in the R-134a systems (attentively study the label on a container).

REMOVAL

Design of the NVR 140S compressor of production of the ATSUGI company

1 — the Thermal safety lock (10 ÷ 15 Nanometers)
2 — the Spline
3 — the Electromagnetic winding
4 — the Pulley
5 — the Clutch coupling

6 — Adjusting washers
7 — the Central bolt (9.1 ÷ 11.8 Nanometers)
8 — a coupling Disk
9 — the Lock-nut (29 ÷ 39 Nanometers)


Design of the V-6 compressor of production of the CALSONIC company

1 — the Screw
2 — the compressor Block
3 — the Field winding
4 — the Persistent ring
5 — the Pulley

6 — Laying
7 — the Persistent ring
8 — a coupling Disk
9 — the Central bolt (14 Nanometers)


Design of the DKS-16H compressor of production of the ZEXEL company

1 — the Electromagnetic winding
2 — the Screw (5 ÷ 6 Nanometers)
3 — the Pulley
4 — a lock washer

5 — the Lock-nut (34 ÷ 39 Nanometers)
6 — a coupling Disk
7 — a shaft Nut (14 ÷ 16 Nanometers)
8 — the Adjusting washer


 PERFORMANCE ORDER

1. Make a discharge of the air conditioning system in the conditions of a specialized workshop.
2. Disconnect a negative wire from the battery.

If the stereosystem established on the car is equipped with a security code before disconnecting the battery make sure that you have the correct combination for input of the audio system in action!

3. Cock the parking brake, prop up back wheels antiretractable boots, then a front of the car and establish to a poddomkratta it on props.
4. Remove a driving compressor belt (see the Head Nastroyki and routine maintenance).

5. Disconnect refrigerator lines from the compressor. At once to a zakuporta the open ends of tubes and unions in order to avoid hit in system of dirt and moisture.

6. Disconnect an electrical wiring from the compressor, then give fixing bolts and remove assembly from a basic arm.

The top fixing bolts can be turned out not up to the end and left in assembly of the compressor before its extraction from the car.

Service

 PERFORMANCE ORDER

On the considered models of cars one of three types of the К/В compressors is used.

Replacement of a clutch coupling of the compressor

 PERFORMANCE ORDER

1. Turn out the central bolt, having stopped a coupling disk a wrench. The coupling can be removed by means of a special extractor.

2. Bend a tag of a lock washer down, give a lock-nut and remove a pulley.

3. If on the interfaced surface signs of damage or traces of an overheat are visible, the drive plate of the coupling and a pulley have to be replaced.
4. Before installation wipe the interfaced pulley surface with solvent.
5. Check a condition of a spiral, - pay attention to existence of signs of weakening of contact and damage of isolation.

6. At installation it is necessary to adjust a gap between a disk and a pulley by selection of adjusting washers, - use the measuring instrument of gaps between electrodes of spark plugs.

7. When replacing a clutch coupling of the compressor do not forget to make its running in, - the compressor has to be switched on not less than 30 times.
8. In the course of a running in there is an accumulation of torque of the coupling. Do not allow hit in the compressor of foreign materials.

INSTALLATION

 PERFORMANCE ORDER

1. Do not forget to transfer a clutch coupling from the old compressor to new.
2. Add in system necessary amount of fresh refrigerator oil, proceeding from the following data:

a) Merge coolant from the compressor removed from the car and measure its volume;
b) Merge the coolant which is present at new assembly;
c) If the amount of the oil merged from the old block made 90 ÷ 150 ml, fill in the same amount of fresh coolant in the new compressor;
d) If from the old compressor less than 90 ml of oil were merged, fill in in new 90 ml;
e) If the amount of the oil merged from the old block exceeded 150 ml, it is necessary to fill in 150 ml of coolant in new assembly.
3. Installation is made upside-down. Do not forget to replace sealing rings of nipple connections of refrigerator lines. Before installation of a ring refrigerator should oil. Remark: Do not forget to put in the compressor two top fixing bolts before new assembly is put on the car.
4. Make charging of system and its check on leaks in the conditions of a specialized workshop.